Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Nov 10, 2022     Engine Accessories - (4.5 hours)       Category: Engine
Installed starter cable and engine ground wire to starter housing. Installed AN 816-4D fittings in #3 cylinder for MP line and on accessory case above Rt mag closeout plate for oil pressure line. Measured for OP, MP and FP lines to order from TS Flightlines. Installed LSE Mini sensors on mount behind starter ring gear. Installed ring gear and set sensor gap @ .040 (range is .030 to .060). Made gapping tool out of strip of .040 alum and pushed sensor forward in mount so it was snug against gapping tool and sensor ring on rear of ring gear. Snugged mount screws while ring gear still mounted. Removed ring gear and tightened mounting screws with blue Loctite.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.